CONTACT FORM

We'd love to hear from you! Send a message to get in touch...

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form
Find US

We look forward to meeting you!

Head Office

#220 - 235 Front Street, Tumbler Ridge, BC
Box 2140, V0C 2W0
Canada

Get Directions
Corporate Office

#2210 - 1177 West Hastings Street,
Vancouver, BC, V6E 2K3
Canada

Get Directions
Travel And Important Site Notifications

Please check back regularly for travel and important site notices

A reminder that a 40kph speed limit has been placed on the Sukunka FSR between 0 and 5km. Please obey all limits and drive responsibly.

Jul 1, 2017 11:00 AM

A road monitor will be monitoring all traffic on the Sukunka and Wolverine FSR over the coming months. Drivers are reminded to ensure their compliance with regulations.

Jul 1, 2017 5:00 AM

Willow Creek Mine

Located 35 minutes southwest of Chetwynd, WIllow Creek Mine is situated near the Pine Pass. The mine is currently undergoing a feasibility analysis for re-commencement of operations.

Overview

In Development

Metallurgical Coal Surface Mine

1.7 million tonnes per year

24 Hours, 7 Days a Week

(250) 788-4225

Willow Creek Mine

Located 35 minutes southwest of Chetwynd, Willow Creek Mine is situated near the Pine Pass. Willow Creek operations consist of a coal processing plant, the “Falls” rail load-out facility where the Brule product is shipped, and a permitted surface mine that produces highest quality, high CSR (70+), low sulfur, low phosphorous hard coking coal and low volatile PCI.  At present the Willow Creek operations are undergoing a feasibility analysis for re-commencement of operations.  At full operating capacity, the Willow Creek Mine has capacity to produce 1.2 million tonnes of mid volatile HCC and 750 thousand tonnes of low volatile PCI.

Willow Creek Fifteen Year Mine Plan

...